Trace a finished product's true cost down through every production level to the very first raw material - and watch a material's price ripple through every sale, in seconds, next to the planned recipe.
Costing a bought-in product is simple. A single production step is still manageable. But in multi-stage manufacturing - where one product becomes the input for the next, sometimes five or six levels deep - working out what a finished product truly cost becomes genuinely hard.
So margin risk hides in the layers, and the batch has already sold - sometimes at a loss - before anyone can see it.
We built a way to actually see it. The full cost unrolls into every material that ever went into the product, with each material's share and price; the same cost is also shown level by level. Next to the actual figures sits the theoretical planned recipe and an instant comparison - and because planned cost uses planned prices, you can see now whether the next batch will cost more, or less, than last period.
The piece we are proudest of: we trace the single biggest material all the way down to the first raw material, and show its price moving inside every sold invoice. It runs on top of the ERP you already use - no migration - recalculates continuously, and computes in seconds.
If your production has layers and your costing stops at the first one, we can unroll yours the same way - on the ERP you already run.
Best for · manufacturers with multi-stage production - food, chemicals, building materials
We start with a fixed-scope AI Opportunity Audit: we map where the hours and the risk actually are, then show you the one or two systems worth building first.
Book a free meetingOr reach us right here, right now - talk, type or call, whichever suits you:
Live video & voice calls run 9am-5pm Brisbane; chat, the AI assistant and email are open any time. Calls are transcribed live into your chat, so everything you discuss stays right here in your messages.